Division 7 Ebook Page 510 Thermafiber

A. Submit under provisions of Section 01300. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods. C. Performance Data: 1. Submit appropriate research reports or evaluation data for products listed in this section. 2. Prior to project closeout, Contractor shall certify in accordance with section 01770 that all products installed pursuant to this section do not contain Asbestos or Polychlorinated Biphenyls (PCB). D. Sustainable Design Submittals: 1. Submit certification/letter from material supplier(s) indicating percentages by weight of post-consumer and pre-consumer recycled content for products having recycled content for LEED Credit MR 4.1 and MR 4.2. a. Include statement indicating cost for each product having recycled content. 2. Submit product data and/or other documentation indicating location of material manufacturer for regionally manufactured materials. a. Include statement indicating cost and distance from the manufacturer to project for each regionally manufactured material. b. Include statement indicating cost and distance from point of extraction, harvest, or recovery to project for each raw material used in regionally manufactured materials. E. Shop Drawings: Submit manufacturers shop drawings describing the type and location of each product specified. F. Verification Samples: For each finish product specified, two samples, minimum size 6 inches (150 mm) square, representing actual product, color, and patterns. 1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: Single manufacturer with a minimum of ten years experience manufacturing or marketing products in this section shall provide all products listed. B. Installer Qualifications: 1. Products listed in this section shall be installed by a single organization with at least two (2) years experience successfully installing insulation on projects of similar type and scope as specified in this section. 2. If the installation of the curtain wall is the responsibility of a different installer, coordinate specified installations prior to commencement of work to ensure the complete system meets the specified ratings. 3. Certification per FM 4991, Underwriters Laboratories, Intertek (OPL) Laboratories, or by the Firestop Contractors International Association (FCIA). C. Fire- Test-Response Characteristics: Provide insulation and related materials with the fire-test-response characteristics indicated, as determined by testing identical products per test method indicated below by Underwriters Laboratories (UL), Intertek (OPL) or another testing and inspecting agency acceptable to authorities having jurisdiction. 07210-3

Previous Page
Next Page