Division 22 23 Ebook Page 167 Pittsburgh Steelers Heinz Field

duct segments," said Bob Lang, SSM project manager. This factory assembly saved the extra step of having to install the liner on the job site. "Aeroflex PLUS Acoustical Duct Liner provides great acoustic performance," Lang said. "It has a tough, abuse-resistant and cleanable service, meets fire resistance codes and resists bacterial and fungal growth." Installed inside metal ducts, it improves energy efficiency and reduces noise transmission with the benefits of an acrylic- coated airstream. Not only do the Owens Corning insulation systems cut installation time and costs, they will help lower operating costs over the life of the stadium. Energy savings stem from the low thermal conductivity of the Fiberglas Pipe Insulation, the reductions in heat loss or gain through duct walls by Aeroflex PLUS Acoustical Duct Liner and Fiberglas All-Service Duct Wrap, and the reduced heat transfer from Fiberglas 705 Insulation Board. Construction of Heinz Field began in June 1999. Looking past the natural grass playing surface, fans could expect to enjoy a stunning view of the riverfront and downtown Pittsburgh through the horseshoe stadium's open south end. The stadium architect is HOK Sports Facilities Group, based in Kansas City, Mo. OWENS CORNING INSULATING SYSTEMS, LLC ONE OWENS CORNING PARKWAY TOLEDO, OHIO, USA 43659 1-800-GET-PINK www.owenscorning.com Pub. No. 45390-A. Printed in U.S.A. January 2007. THE PINK PANTHER & 1964-2007 Metro-Goldwyn-Mayer Studios Inc. All Right Reserved. The Color PINK is a registered trademark of Owens Corning. 2007 Owens Corning. TM

Previous Page
Next Page